Pool Renovation & Restoration Services
Pool renovation covers resurfacing, tile replacement, waterproofing and changes to the surrounding deck. An inspection should establish which parts can be retained and which need replacement before you compare renovation with rebuilding.
Indicative renovation budgets start from 5,000 SAR for minor repairs and reach 50,000 SAR or more for complete rehabilitation.
Available Restoration Services
Pool Renovation Prices
These are planning estimates, not fixed quotes or guaranteed reopening dates. Confirm inspection findings, demolition, disposal, materials, access, VAT and exclusions. The schedule must allow for the selected materials’ curing requirements, testing and recommissioning.
| Service | Approx. Price (SAR) | Indicative work period |
|---|---|---|
| Minor crack repair | 5,000 - 10,000 | 2-5 days |
| Waterproofing restoration | 8,000 - 15,000 | 5-10 days |
| Full tile replacement | 15,000 - 35,000 | 10-20 days |
| Filtration system upgrade | 5,000 - 15,000 | 2-3 days |
| Complete renovation (full rehabilitation) | 30,000 - 60,000+ | 20-40 days |
Pool resurfacing or tile replacement?
Start with the existing finish and the affected area. A surface assessment should distinguish staining or deposits from damaged material, and isolated tile defects from widespread failure. Ask the contractor to explain the proposed preparation and why the chosen system suits the existing pool.
| Scope | What the quote should identify |
|---|---|
| Resurfacing | Existing finish, removal or preparation, proposed finish, treated area and curing requirements. |
| Waterline tile replacement | Length and height of the band, coping interfaces, preparation and whether surrounding finishes can remain. |
| Full retiling | Measured surface area, tile specification, substrate repairs, waterproofing scope, adhesive and grout system. |
| Waterproofing restoration | Diagnosis behind the proposal, affected areas, compatible materials and testing included before refilling. |
New tiles are not a diagnosis for water loss. For an unexplained leak, pump fault or filter problem, begin with pool maintenance and repair assessment. Bring the findings into the renovation quote if wider work is needed.
Pool deck and surround renovation
List the deck area separately from the pool interior. Compare paving or finish samples, slip-resistance information, drainage, coping edges and access for the work. For exposed Saudi courtyards, ask how the chosen material and shade layout affect comfort during the intended hours of use.
A deck quote should state whether it includes removal, substrate work, drainage adjustments and reinstatement of adjacent areas. Matching an existing finish may limit the available options; confirm the sample before ordering.
Renovating a villa, hotel or compound pool
The physical work and the operating plan belong in the same proposal. A private owner may have flexibility over closure dates; a hotel or compound needs an agreed period when the pool is unavailable, access arrangements and a handover plan. Discuss these before fixing the work dates.
Equipment upgrades can be priced as separate options. Replacing a finish does not by itself mean the pump and filter also need replacement. Ask which items are essential to the repair and which are optional improvements.
What to prepare for a renovation quote
- Give the city, pool dimensions, pool type and current finish.
- Describe the problem, its location and any previous repair or leak-detection findings.
- Identify whether the scope is waterline tiles, the full interior, the deck or a wider redesign.
- State site-access restrictions and the period available for closure.
- Compare itemised scope, exclusions, materials, testing, warranty terms and the conditions for reopening.
Leave your details in the form to discuss the project. The written quotation should follow an assessment of the pool; a photograph or a single symptom is not enough to confirm structural condition.